Skip to main content

HK-J08 - January 16th, 2008

Notes
  • Lowest PM number of 30 run series
  • Hard maple, medium and large pieces, 16% moisture, large load 64.6 lbs
  • 10 pieces, 3.5 lbs kindling
  • Cold fuel, stacked in warm firebox for 90 minutes. Warm heater (24 hrs)
  • 0.5 g/kg PM (Condar)
  • 27.2 g/kg CO
  • 74.8 % overall efficiency
Animation

Anim-J08.gif

Flue Gas

gas-HK-J08.gif

Opacity

opacity-HK-J08.gif

The spike at 32 minutes is when air is cut back (ashbox door closed). With a very large fuel load such as this, it may be advantageous to delay closing the door to 350F.

Statistics

Condar-HK-J08.gif

Fuel stack

J08-02.jpg

J08-01.JPG

Resources