Skip to main content

HK-G11 - February 18th, 2006

Test HK-G11
February 18/06

  • Restricted air (ashbox door closed, air control open)
  • Large wood, large load

Animation-G11.gif

Test HK-G11


Feb 18/06

 

61.6 lbs

 

Ashbox door closed
(restricted air)

 

Grate was opened at 95 minutes.


The laser lost aim and had to be reset. Zero value in doubt.

 

Excel Data File: test2006-g11.xls

graph-G11.gif

G11-06.jpg


The animation shows a frame every 30 seconds of the burn for the first twenty minutes.

 

After that, it shows a frame every 5 minutes, so is speeded up by a factor of 10 until the end.

 

The animation loads frame by frame, and then starts repeating at a frame rate of 2 fps.

G11-10.jpg


graph-G11b.gif

G11-16.jpg


graph-G11c.gif

G11-42.jpg



G11-50.jpg



G11-53.jpg


graph-G11d.gif

G11-57.jpg



G11-61.jpg


G11-01.jpg

G11-01a.JPG