HK-G11 - February 18th, 2006
Test HK-G11
February 18/06
- Restricted air (ashbox door closed, air control open)
- Large wood, large load
|
Test HK-G11
61.6 lbs
Ashbox door closed
Grate was opened at 95 minutes. The laser lost aim and had to be reset. Zero value in doubt.
Excel Data File: test2006-g11.xls |
||
|
The animation shows a frame every 30 seconds of the burn for the first twenty minutes.
After that, it shows a frame every 5 minutes, so is speeded up by a factor of 10 until the end.
The animation loads frame by frame, and then starts repeating at a frame rate of 2 fps. |
||














No Comments